<v Chris>Hi, this is Chris Morris</v>

2
00:00:07.180 --> 00:00:08.490
and I'm the surface water specialist

3
00:00:08.490 --> 00:00:10.770
at the USGS in Las Vegas, Nevada.

4
00:00:10.770 --> 00:00:13.400
I will be talking about non-standard culverts.

5
00:00:13.400 --> 00:00:15.060
In previous videos I discussed surveying

6
00:00:15.060 --> 00:00:16.100
the approach high-water marks,

7
00:00:16.100 --> 00:00:18.817
the tailwater high-water marks, an approach cross-section,

8
00:00:18.817 --> 00:00:21.110
and the general attributes of box, pipe,

9
00:00:21.110 --> 00:00:23.060
and pipe arch culverts.

10
00:00:23.060 --> 00:00:25.650
Even if you have some aspect of a non-standard culvert,

11
00:00:25.650 --> 00:00:27.080
you will still need to measure features

12
00:00:27.080 --> 00:00:28.653
described in those videos.

13
00:00:29.690 --> 00:00:31.660
The information presented in this single-component video

14
00:00:31.660 --> 00:00:35.140
can also be found in TWRI 3-A3,

15
00:00:35.140 --> 00:00:36.690
Measurement of Peak Discharge at Culverts

16
00:00:36.690 --> 00:00:38.290
by Indirect Methods.

17
00:00:38.290 --> 00:00:39.790
Not every unique circumstance

18
00:00:39.790 --> 00:00:41.290
can be discussed in this video,

19
00:00:41.290 --> 00:00:42.740
so if you do have a non-standard culvert,

20
00:00:42.740 --> 00:00:44.550
having the TWRI to reference in the field

21
00:00:44.550 --> 00:00:45.973
is especially important.

22
00:00:47.150 --> 00:00:48.890
As mentioned in previous videos,

23
00:00:48.890 --> 00:00:50.510
good clear notes are needed.

24
00:00:50.510 --> 00:00:52.830
With complex culverts or when combined with other methods,

25
00:00:52.830 --> 00:00:54.900
say a road overflow, it is easy

26
00:00:54.900 --> 00:00:56.530
to forget to measure the beveling or note

27
00:00:56.530 --> 00:00:58.780
if you measured the top or bottom of the culverts.

28
00:00:58.780 --> 00:00:59.970
There is nothing worse than finding

29
00:00:59.970 --> 00:01:02.420
that a critical element was missed a few months ago,

30
00:01:02.420 --> 00:01:04.430
and an additional site visit or survey is needed

31
00:01:04.430 --> 00:01:06.340
to finish the computation.

32
00:01:06.340 --> 00:01:08.190
Even for someone who has surveyed many culverts,

33
00:01:08.190 --> 00:01:09.610
I find having a checklist is useful

34
00:01:09.610 --> 00:01:10.960
to get everything you need.

35
00:01:12.010 --> 00:01:13.750
Let's first look at mitered culverts,

36
00:01:13.750 --> 00:01:15.170
or those with entrances and exits

37
00:01:15.170 --> 00:01:18.020
that are at an angle to match the embankment.

38
00:01:18.020 --> 00:01:20.270
The top and bottom of the culvert have different lengths,

39
00:01:20.270 --> 00:01:23.060
so where should you measure for the total culvert length?

40
00:01:23.060 --> 00:01:24.700
If the culvert entrance was submerged,

41
00:01:24.700 --> 00:01:26.790
completely underwater, the length of the culvert

42
00:01:26.790 --> 00:01:27.970
from the top of the entrance

43
00:01:27.970 --> 00:01:30.500
to the top of the exit should be measured.

44
00:01:30.500 --> 00:01:32.510
If the culvert entrance was not submerged,

45
00:01:32.510 --> 00:01:34.540
the length of the culvert from where the water surface

46
00:01:34.540 --> 00:01:36.710
first intersects with the culvert entrance

47
00:01:36.710 --> 00:01:38.350
and where it intersects with the culvert exit

48
00:01:38.350 --> 00:01:39.403
should be measured.

49
00:01:40.840 --> 00:01:42.730
The question of the length from the culvert

50
00:01:42.730 --> 00:01:44.520
for the approach also arises.

51
00:01:44.520 --> 00:01:46.400
Should you measure from the top of the culvert entrance

52
00:01:46.400 --> 00:01:47.540
or the bottom?

53
00:01:47.540 --> 00:01:49.090
This one requires a little math.

54
00:01:49.090 --> 00:01:51.140
Don't worry, it's easy.

55
00:01:51.140 --> 00:01:53.350
Take the water surface elevation at the approach

56
00:01:53.350 --> 00:01:55.650
and subtract the elevation at the invert,

57
00:01:55.650 --> 00:01:57.660
or the bottom of the culvert entrance.

58
00:01:57.660 --> 00:02:00.370
Now divide this number by the culvert diameter.

59
00:02:00.370 --> 00:02:01.940
If the result is less than one,

60
00:02:01.940 --> 00:02:04.980
then measure the distance using a tape from the approach

61
00:02:04.980 --> 00:02:06.830
to where the water surface first intersects

62
00:02:06.830 --> 00:02:08.730
with the culvert entrance.

63
00:02:08.730 --> 00:02:11.020
If the number calculated is greater than one,

64
00:02:11.020 --> 00:02:12.470
then measure the distance using a tape

65
00:02:12.470 --> 00:02:15.050
from the approach to the top of the culvert.

66
00:02:15.050 --> 00:02:17.340
Finally, sometimes the first length of a mitered culvert

67
00:02:17.340 --> 00:02:19.710
is at a different slope then the rest of the pipe.

68
00:02:19.710 --> 00:02:22.650
If so, measure the culvert invert at full pipe,

69
00:02:22.650 --> 00:02:25.260
or when the mitering of the pipe stops.

70
00:02:25.260 --> 00:02:26.830
If there are multiple culverts,

71
00:02:26.830 --> 00:02:28.870
the distance for the approach upstream should be

72
00:02:28.870 --> 00:02:32.730
at least one to three times the sum of the culvert widths.

73
00:02:32.730 --> 00:02:34.840
Sometime the culverts may have different slopes,

74
00:02:34.840 --> 00:02:36.190
be made of different materials,

75
00:02:36.190 --> 00:02:38.030
or have different elevations.

76
00:02:38.030 --> 00:02:40.780
All culverts need to be surveyed and measured.

77
00:02:40.780 --> 00:02:42.880
Additionally, the separation between each culvert

78
00:02:42.880 --> 00:02:44.880
should be measured and noted.

79
00:02:44.880 --> 00:02:47.590 line:15% 
For those that are located more than 10% of the diameter

80
00:02:47.590 --> 00:02:49.340
or width of the culverts apart,

81
00:02:49.340 --> 00:02:51.150
they will be treated as multiple components,

82
00:02:51.150 --> 00:02:53.140
as is discussed in another video, however,

83
00:02:53.140 --> 00:02:55.950
no additional field work will be needed.

84
00:02:55.950 --> 00:02:57.970
After a flood, material is often found

85
00:02:57.970 --> 00:02:59.143
in the culvert itself.

86
00:03:00.540 --> 00:03:03.000
More often than not, here in Nevada I find sand fill

87
00:03:03.000 --> 00:03:05.320
in the first few feet of the culvert.

88
00:03:05.320 --> 00:03:06.760
When this material is loose,

89
00:03:06.760 --> 00:03:09.220
it is typically assumed that at the peak itself,

90
00:03:09.220 --> 00:03:11.290
the high velocities keep the culvert clean

91
00:03:11.290 --> 00:03:12.510
and the material is deposited

92
00:03:12.510 --> 00:03:14.560
on the recession of the peak.

93
00:03:14.560 --> 00:03:17.710
The next peak again removes it on the rise.

94
00:03:17.710 --> 00:03:19.960
However, at some sites the material is well compacted

95
00:03:19.960 --> 00:03:22.170
or naturally cemented and doesn't appear to change

96
00:03:22.170 --> 00:03:24.180
as a result of peaks.

97
00:03:24.180 --> 00:03:26.980
The same can be true for debris at the entrance.

98
00:03:26.980 --> 00:03:29.220
If it is thought the material was present at the peak,

99
00:03:29.220 --> 00:03:31.290
the obstructed area needs to be measured.

100
00:03:31.290 --> 00:03:33.530
For example, if I found gravel well compacted

101
00:03:33.530 --> 00:03:34.940
and cemented in a box culvert,

102
00:03:34.940 --> 00:03:37.640
I would need survey a cross-section in the culvert,

103
00:03:37.640 --> 00:03:39.000
or if that was not possible,

104
00:03:39.000 --> 00:03:41.170
dig part of the culvert clear and use a folding ruler

105
00:03:41.170 --> 00:03:45.320
to directly measure the depth to compute an accurate area.

106
00:03:45.320 --> 00:03:47.810
Take time in the field to assess if the culvert was clear

107
00:03:47.810 --> 00:03:50.453
at the peak or was impacted by debris or fill.

108
00:03:51.410 --> 00:03:53.580
Some culverts actually have natural bottoms.

109
00:03:53.580 --> 00:03:56.140
In such situations, a cross-section needs to be surveyed

110
00:03:56.140 --> 00:03:58.450
at both the culvert entrance and exit.

111
00:03:58.450 --> 00:04:01.770
An average elevation will be used for the invert.

112
00:04:01.770 --> 00:04:04.500
A final special case is running a slope-area measurement

113
00:04:04.500 --> 00:04:06.310
inside of a culvert.

114
00:04:06.310 --> 00:04:07.750
Unlike a natural channel,

115
00:04:07.750 --> 00:04:09.470
a culvert with a concrete or metal floor

116
00:04:09.470 --> 00:04:11.890
is not subject to scour or fill.

117
00:04:11.890 --> 00:04:14.210
In the situation when the flow was not conducive

118
00:04:14.210 --> 00:04:17.780
to a culvert measurement, this can be a good alternative.

119
00:04:17.780 --> 00:04:19.800
However, often high-water marks are hard to find

120
00:04:19.800 --> 00:04:22.100
inside the culvert barrel and flow may be wavy

121
00:04:22.100 --> 00:04:25.510
or indicative of unsteady flow from high velocities.

122
00:04:25.510 --> 00:04:27.720
If a slope-area measurement is attempted,

123
00:04:27.720 --> 00:04:29.910
it should be done away from the culvert entrance.

124
00:04:29.910 --> 00:04:31.560
More information about slope area measurements

125
00:04:31.560 --> 00:04:33.790 line:15% 
can be found in other videos.

126
00:04:33.790 --> 00:04:34.840
If you need help in the field,

127
00:04:34.840 --> 00:04:36.710
call your supervisor, surface-water specialist,

128
00:04:36.710 --> 00:04:38.460
or indirect measurement specialist.
